Build Group International

San Francisco
457 Minna Street
San Francisco, CA 94103
P: 415.367.9399

Silicon Valley
1210 Coleman Avenue
Santa Clara, CA 95050
P: 408.986.8711

Southern California
700 S. Flower Street
Suite 575
Los Angeles, CA 90017
P: 213.212.9802

Foothill College, Phase I & II

Foothill College, Phase I & II

Los Altos

Year Completed

2011

Owner

Chevron Energy Solutions

Structural Engineer

Blymyer Engineers

Project Data Sheet

Description

This project included 2MW on one college campus, 150,889 SF of elevated structure, 216 T structures, 8,520 panels and was a DSA Project. It entailed building canopy support structures on three separate parking lots within the campus. The client chose to commence construction during the Summer months while traffic was lighter, however campus operations continued for Summer session. Tight control over the site and careful compliance with safety measures ensured successfully meeting the aggressive schedule without incident. Solarworld 240 watt panels were used.

Total Gross Square Feet

150,889 sq ft

Market Sector

Solar

Office

San Francisco

Close
Contact

San Francisco
457 Minna Street
San Francisco, CA 94103
P: 415.367.9399

Silicon Valley
1210 Coleman Avenue
Santa Clara, CA 95050
P: 408.986.8711

Southern California
700 S. Flower Street
Suite 575
Los Angeles, CA 90017
P: 213.212.9802