Build Group International

San Francisco
457 Minna Street
San Francisco, CA 94103
P: 415.367.9399

Silicon Valley
1210 Coleman Avenue
Santa Clara, CA 95050
P: 408.986.8711

Oakland
405 14th Street, Suite 900
Oakland, CA 94612
P: 415.367.9399

Southern California
1212 Abbot Kinney Blvd. Unit A
Venice, CA 90291
P: 213.212.9802

Cadence Design

Cadence Design

San Jose

Year Completed

2009

Owner

Cadence Design Systems, Inc.

Architect

RMW Architecture

Project Data Sheet

Description

Five-story, 205,000 SF office building and 8 tenant improvement projects situated on a 12-acre site.

Building 10 has an energy conscious architectural design which was developed for the mild climate of North America. A five-story 205,000 SF steel-frame and pre-cast concrete Engineering Office Building. The project includes the complete re-configuration of the main parking and common areas of the corporate campus, and a new entry and intersection at Montague Expressway. This high-tech facility features an aesthetically striking staircase and rooftop trellis which spans the length of the building.

This project also includes a two-story, 84,000 SF steel-frame and concrete tilt-up, executive briefing / office center, which included a full athletic facility.

Total Gross Square Feet

289,000 sq ft

Market Sector

Commercial Office

Office

Silicon Valley

Close
Contact

San Francisco
457 Minna Street
San Francisco, CA 94103
P: 415.367.9399

Silicon Valley
1210 Coleman Avenue
Santa Clara, CA 95050
P: 408.986.8711

Oakland
405 14th Street, Suite 900
Oakland, CA 94612
P: 415.367.9399

Southern California
1212 Abbot Kinney Blvd. Unit A
Venice, CA 90291
P: 213.212.9802

The health and safety of our employees and the people in the communities where we live and work is our highest priority. Build Group is closely monitoring COVID-19 and following the recommendations of the Centers for Disease Control and Prevention (CDC) and OSHA, as well as state and local governments.

We have comprehensive safety practices and are promptly adding the most current recommendations related to making our job sites and offices safe as related to COVID-19.

Our practices include key elements such as:

  • Social distancing protocols
  • Cleaning and disinfecting procedures
  • Extended training, monitoring, and reporting
  • Exposure risk assessment tools

To date, construction has consistently been designated as essential throughout the various county and state orders. This means that it is anticipated we will continue to provide our services to build the infrastructures in a way that provides for the greatest level of health and safety for our employees and the community. This includes continuing to follow the guidelines of the CDC and OSHA as well as state and local governments. We also understand the challenges this crisis brings to our employees, and therefore, the importance of maintaining our operations in order to help sustain the livelihoods of our employees.